DHL/Graphic Packaging International | Monroe, Louisiana
Building 1: Distribution – 792,696 Total SF Distribution Center
- 250,000 SF 10” Reinforced Concrete Slab
- ESFR Fire System with Water Storage Tank
- Automatic Guided Vehicles (AGVs)
- 2-Line Rail Served with Exterior Rail Dock
- Soil Cement Stabilization at Pad and Pavement Areas
Building 2: Manufacturing- 479,778 Total SF Manufacturing Facility
- 37, 500 SF 10” Reinforced Concrete Slab
- Three (3) New State-of-the-Art Printing Presses
- Equipment Foundations with Auger Cast Piers
- Six (6) 4,000 AMP Electrical Services
- ESFR Fire System with Water Storage Tank
- Automatic Guided Vehicles (AGVs)
- 69’ Girder Spans
- Soil Cement Stabilization at Pad and Pavement Areas 10’ Moisture Conditioned Pad
- Approximately 3,000 LF Compressed Air with Three (3) Compressors
- Approximately 2,800 LF Chilled Water Supply
- One (1) 25-Ton Bridge Crane and Two (2) 0.5 Ton Hoists