Skip to content

ARCO Completes Addition for Tenneco

ARCO Completes Addition for Tenneco.


Construction recently completed on a 117,180 SF Automotive Component Manufacturing Facility Addition. The project specifications include:

6,666 SF Office
2500 AMP Service
1600 AMP Electrical Buss Duct
Fume Extraction System with Fully Secured Enclosure
Argon, CO2 and Air Compressor with Fully Secured Enclosure and Guardrail Protection
Five (5) Air Changes Per Hour
Internet Ready Utility Metering Systems to Read Usage Remotely
Load Bearing Tilt-Up Concrete Construction with 30’ Clear Height
Six (6) Dock Doors and One (1) Drive-in Door
Fully Fenced, Secured Thirty (30) Trailer Parking Lot

To see more pictures from this project follow the link below
http://www.arcokc.com/projects/tenneco/