804,434 SF Automotive Component Manufacturing & Distribution Facility

    • One Hundred and Thirty-Two (132) Dock Positions
    • 1 Air Change Per Hour with HVLS 24’ Fans Throughout the Warehouse
    • 8000 AMP Service with Generator Backup
    • 200 HP Fire Pump with Generator Backup
    • 100 FC Warehouse Lighting
    • Eight (8) Different Office Locations Totaling over 24,000 SF
    • Full Access Control System
    • Full Lighting Protection System
    • FM 90 Roof System
    • Full FM/AON Fire Protection System
    • Five (5) Overhead Drive-Thru Doors
    • Tilt-Up Concrete Construction
    • 32’ Clear Height
    • Opportunity to Expand 300,000 SF and Add 466 Parking Spaces
    • 64 Acre Site
    •