Skip to content

Brandy Linen | Las Vegas, Nevada

77,000 SF Hospitality Laundry Build-Out

  • Installation of all process piping, equipment venting, and electrical distribution for all process equipment
  • Two 12-Module Milnor Tunnel Washers and Dryer Lines
  • Finishing Equipment by Chicago Dryer
  • E-Tech Soil Side Rail
  • Two 200 HP Boilers with TEA Hot and Tempered Water System
  • Complete build-out of all building modifications for a laundry plant including all concrete trenching/pits, boiler room, break room, gang restrooms, etc.
  • Site Utility Upgrades including 5 psi gas service, 4000 AMP, electrical service, 6” water line, and an 8” sanitary line