Brandy Linen | Las Vegas, Nevada
77,000 SF Hospitality Laundry Build-Out
- Installation of all process piping, equipment venting, and electrical distribution for all process equipment
- Two 12-Module Milnor Tunnel Washers and Dryer Lines
- Finishing Equipment by Chicago Dryer
- E-Tech Soil Side Rail
- Two 200 HP Boilers with TEA Hot and Tempered Water System
- Complete build-out of all building modifications for a laundry plant including all concrete trenching/pits, boiler room, break room, gang restrooms, etc.
- Site Utility Upgrades including 5 psi gas service, 4000 AMP, electrical service, 6” water line, and an 8” sanitary line