“Quality remains long after the price is forgotten.”

- H. Gordon Selfridge

Skip to content

ARCO Raving Fan Honored with Capstone Award

ARCO Raving Fan Honored with Capstone Award

 

ARCO Raving Fan Honored with Capstone Award

ARCO repeat client, Block Real Estate Services, was recently honored with a Capstone Award from the Kansas City Business Journal! The Capstone Awards recognize the area’s top real estate projects of the year. This year’s winners faced stiff competition with just 25 honorees selected from the 100 submissions. Lenexa Logistics Centre Building 7, a 401,100 SF speculative warehouse, earned top marks in the industrial category. This is the fourth ARCO project to receive a Capstone Award.

ARCO is proud to have completed this impressive building and looks forward to continuing our longstanding, successful partnership with Block Real Estate Services!

Click here to view the complete list of winners.

 

 

 

 

 

 

 

 

 

 

 

ARCO Completes New Senior Living Facility for NorthPoint Development

ARCO Completes New Senior Living Facility for NorthPoint Development. 


Construction recently completed on a 76,664 sf assisted living and memory care facility. The project specifications include:

Eighty-Five (85) Studio, One Bedroom, and Two Bedroom Units for a total of One Hundred and Two (102) Beds
Two-Story Wood Framing with Supplemental Structural Steel in the Central Core of the Building
Stone Veneer and Fiber Cement Siding Exterior Finishes 4.5 Acre Site
Full Amenities Including:

• Full Service Kitchen
• Large Exterior Courtyards and Dog Park
• Covered Exterior Patios
• Large Windows Throughout
• Salon and Day Spa
• Fitness and Wellness Center
• Theater
• Activity Rooms
• Bistro

To see more pictures from this project follow the link below

Stonecrest Senior Living – Indianapolis

 

No-Shave November

ARCO-KC Gearing Up For No-Shave November!


It’s been a whole year and No Shave November is back! The ARCO KC team is at it again letting ourselves go for a month in order to raise awareness for finding a cure for cancer. Thanks to many generous donations, we raised over $5,000 last year and we’re looking to more than double that this year.

This year is a very special one for us at ARCO. One of our shareholders lost his life to cancer in February and we’re doing this one for Dave and in his memory. We’ve got ALL of our companies across the US participating and a competition has already begun. As a whole corporation, we’re looking to raise over $250,000!

Because you like the KC team the best, we’re hoping you’ll donate to our page first. Anything you can spare helps. You can donate at the link below.

Click Here to Donate Today!

ARCO Completes New Speculative Building for Block Development

ARCO Completes New Speculative Building for Block Development


Construction recently completed on a 401,100 SF Speculative Warehouse. The project specifications include:

36’ Clear Height
50’x 54’6” Interior Bays and 65’ x 54’6” Staging Bays
7” Thick Concrete Floor Slab
Load Bearing Tilt-Up Concrete Walls
Forty (40) Dock Positions including Mechanical Levelers, Dock Seals, and Swing Lights
Four (4) 12’x 14’ Motor Operated Drive-In Doors
Mechanically Fastened 45 mil TPO Roof System with r-20 Insulation
ESFR Sprinkler System
3000 Amp Electrical Service
25 fc Level Lighting Achieved Thru T5 HO Fluorescent Light Fixtures with Motion Sensors
Eight (8) Featured Entrances

To see more pictures from this project follow the link below

LLC South, Building #7

 

ARCO Completes Facade Renovation for Vivion Road Development

ARCO Completes Facade Renovation at Vivion & North Oak Shopping Center


Construction recently completed on a 38,000 SF Facade Renovation. The project specifications include:

Structural Stud Framing with Stone, Brick, and EIFS Façade
New Glass Storefront Throughout
Structural Modifications Required for New Façade
New TPO Roofing Installed on Retail Center
Footing Modification Required for New Façade
Work Completed with Active Tenants

To see more pictures from this project follow the link below

http://www.arcokc.com/projects/vivion-n-oak-shopping-center/

 

ARCO Completes Renovation for Bunzl

ARCO Completes Renovation for Bunzl


Construction recently completed on a 165,000 SF Existing Warehouse Renovation. The project specifications include:

30,000 SF Office and Common Space Renovation
Widened and Heightened Dock Openings at Four (4) Dock Positions
Installed Four (4) Overhead Insulated Dock Doors
Replaced Two (2) Mechanical Dock Levelers
Replaced Four (4) Dock Shelters
Repaired Over 1,500 SF of Failing Concrete Slab
Replaced Exterior Wall Pack Lighting
Insulated Dock Wall with R11 Stick Pin Insulation
Re-Painted Entire Exterior of Warehouse
Replaced 30,000 SF Office Lighting with New LED Fixtures
Conditioned Existing Warehouse with Twenty-Six (26) Unit Heaters
Repaired Vertical Stress Cracks in Exterior Block Walls
Installed New Dock Door Weather Canopy
17,000 SY Parking Lot Seal-coated and Striped

To see more pictures from this project follow the link below

http://www.arcokc.com/projects/bunzl/

ARCO Completes Addition for Tenneco

ARCO Completes Addition for Tenneco.


Construction recently completed on a 117,180 SF Automotive Component Manufacturing Facility Addition. The project specifications include:

6,666 SF Office
2500 AMP Service
1600 AMP Electrical Buss Duct
Fume Extraction System with Fully Secured Enclosure
Argon, CO2 and Air Compressor with Fully Secured Enclosure and Guardrail Protection
Five (5) Air Changes Per Hour
Internet Ready Utility Metering Systems to Read Usage Remotely
Load Bearing Tilt-Up Concrete Construction with 30’ Clear Height
Six (6) Dock Doors and One (1) Drive-in Door
Fully Fenced, Secured Thirty (30) Trailer Parking Lot

To see more pictures from this project follow the link below
http://www.arcokc.com/projects/tenneco/

ARCO Completes General Motors Facility in Indiana

ARCO Completes General Motors Facility in Indiana.


Construction recently completed on a new 804,434 SF automotive component manufacturing and distribution facility. The project specifications include:

One Hundred and Twenty Six (126) Dock Positions
1 Air Change Per Hour with HVLS 24’ Fans Throughout the Warehouse
8000 AMP Service with Generator Backup
200 HP Fire Pump with Generator Backup
100 FC Warehouse Lighting
Eight (8) Different Office Locations Totaling over 24,000 SF
Full Access Control System
Full Lighting Protection System
FM 90 Roof System
Full FM/AON Fire Protection System
Tilt-Up Concrete Construction
32’ Clear Height
Opportunity to Expand 300,000 SF and Add 466 Parking Spaces
64 Acre Site

To see more pictures from this project follow the link below

http://www.arcokc.com/projects/general-motors-project-canal/

ARCO Completes Mission Road Medical Office Building

ARCO Completes a New Medical Office Building in Prairie Village, KS


Construction recently completed on a new 21,360 SF Two-Story Medical Office Building. The project specifications include:

Warm Lit Shell Constructed with Open Interior
Thin Clad Stone Veneer with Reveal Accents and EIFS Cornice
Full Perimeter Building Up/Down LED Accent Lighting
Aluminum Composite Panel at Entry Canopies & Above at Roof Line
Bronze Anodized Insulated Aluminum Storefront at all Windows and Entrances
Site Features Modular Concrete Block Retaining Wall and Ornamental Mental Fence

Aperture: 2.8Camera: FC300XIso: 200Copyright: ©Chad Jackson. All Rights Reserved
« 1 of 2 »

ARCO Completes General Motors Facility in Kansas City

ARCO Completes General Motors Facility in Kansas City, KS


Construction recently completed on a new 804,434 SF Automotive Component Manufacturing & Distribution Facility. The project specifications include:

One Hundred and Thirty-Two (132) Dock Positions
1 Air Change Per Hour with HVLS 24’ Fans Throughout the Warehouse
8000 AMP Service with Generator Backup
200 HP Fire Pump with Generator Backup
100 FC Warehouse Lighting
Eight (8) Different Office Locations Totaling over 24,000 SF
Full Access Control System
Full Lighting Protection System
FM 90 Roof System
Full FM/AON Fire Protection System
Five (5) Overhead Drive-Thru Doors
Tilt-Up Concrete Construction
32’ Clear Height
Opportunity to Expand 300,000 SF and Add 466 Parking Spaces
64 Acre Site

Aperture: 2.8Camera: FC300XIso: 200Copyright: ©Chad Jackson. All Rights Reserved
« 2 of 5 »